Filter by:
- Remove explicit inclusion of Dairy case studies
- Remove explicit inclusion of Cheese case studies
- Include Food case studies
- Include Beverage case studies
- Include Plant case studies
- Remove explicit inclusion of Process Solutions case studies
- Include CIP Systems case studies
- Include Pasteurisation case studies
- Include Membrane Filtration case studies
- Include Cheese processing case studies
-
Cream Storage and Mixproof Routing Manifold
Sycamore Process Engineering have recently delivered a Bulk Cream Storage and Mixproof Routing Manifold for a major dairy co-operative at their processing facility in Devon. This project was a complete end-to-end process solution from mechanical and process design, manufacture, installation and commissioning. The requirement for this project arose from our customer originally only having internal […]
-
Process Upgrades at Princes Cardiff Centre of Excellence
Sycamore Process Engineering has recently delivered phase 3 of Princes Group process upgrades at their Cardiff Centre of Excellence. This project involved the relocation of equipment from their former Manchester production facility, upgrades of existing equipment as well as specification and installation of new process equipment. The initial stages of this project were led by […]
-
Wyke Farms Cream Pasteuriser
Sycamore Process Engineering has completed another successful project for the renowned cheesemakers Wyke Farms with the design, manufacture, installation, and commissioning of a 4,000 l/hr cream pasteuriser. Wyke Farms are well known for the production of their famous cheddar cheeses that they have been producing in the heart of Somerset for over 160 years using […]
-
Increased production time with new CIP set for UK producer of Cathedral City Cheese
Sycamore Process Engineering is delighted to announce it has completed a major upgrade project at Saputo, Davidstow, to install their largest CIP set to date. A system which allows the cheese maker a significantly reduced window for cleaning and additional flexibility on CIP cycles, giving an increase in production time. “Commissioning of the new system […]
-
Duplex Pasteuriser project for a major Dairy Cooperative
The team at Sycamore Process Engineering has now completed the most recent project for a large European dairy cooperative at one of their sites in Devon, UK. This project included the design, manufacture, and installation of the new Duplex Pasteurisation system that have flow rates of up to 66,000l/hr with the ability to run in […]
-
Three Tank Whey Protein Concentrate Export System
The team at Sycamore Process Engineering has recently completed an upgrade to a Three Tank Whey Protein Concentrate (WPC) Export System for our customer in Northern Ireland. The customer has operations across the UK and Ireland, producing a wide range of dairy products that are sold in the UK and Ireland while being exported to […]
-
CIP Relocation Project
Sycamore Process Engineering has recently completed a project for a multinational dairy cooperative at their site in Scotland. This project has been carried out over the last four months after we received a purchase order at the beginning of March 2021. The project was completed after a successful commissioning period in the middle of June […]
-
State-of-the-art CIP system installed at Arla Foods UK, Lockerbie
Sycamore Process Engineering was hired to design, manufacture, install and commission a replacement CIP system for raw milk cleaning applications. The existing CIP system at Arla foods was installed more than 45 years ago and after many successful years of service, it was in need of an upgrade – enter Sycamore! “Communication from the beginning […]
-
New and improved desserts plant for Shrewsbury creamery
The team at Sycamore Process Engineering has recently completed a desserts plant upgrade for one of the UK’s leading dessert manufacturers. The creamery, which makes a huge range of desserts in a variety of shapes, sizes and flavours, had three existing dessert processing plants, each with a pasteuriser at its core. Over time the heat exchangers […]